RESEARCH PROGRESS
Duc Hoai
Nguyen
Last modified: 21 July 09
1.
CURRENT TASKS
-
Doing the Web Testing case study
2.
THESIS CHAPTERS
|
Sections |
Change 1 |
Change 2 |
Change 3 |
Change 4 |
Change 5 |
|
1.
INTRODUCTION |
|
|
|
|
|
|
2.
CONTRIBUTIONS |
|
|
|
|
|
|
3.
RELATED WORK |
|
|
|
|
|
|
3.1.
GUI
MODELS |
|
|
|
|
|
|
3.2.
COVERAGE
CRITERIA |
|
|
|
|
|
|
3.3.
TEST
CASE GENERATION |
|
|
|
|
|
|
3.4.
TEST
ORACLES |
|
|
|
|
|
|
3.5.
TEST
GENERATION TOOLS |
|
|
|
|
|
|
3.6.
A TAXANOMY
OF MGT APPROACHES |
|
|
|
|
|
|
3.7.
CONCLUSIONS |
|
|
|
|
|
|
4.
THE PROPOSED
APPROACH
|
|
|
|
|
|
|
4.1.
THE
ACTION-EVENT FRAMEWORK (AEF) |
Duc: submitted in July 2 |
Paul:
review in 21st July |
|
|
|
|
|
|
|
|||
|
4.2. 4.3. THE ACTION MODEL |
|
|
|
||
|
4.3.
THE GUI MODEL |
|
|
|
|
|
|
4.4.
THE MAPPING MODEL |
|
|
|
|
|
|
4.5.
CHECKING OF MODEL CONSISTENCY |
|
|
|
|
|
|
4.6.
REGRESSION CHECKING |
|
|
|
|
|
|
4.7.
TESTING
PROCESS IN AEF |
|
|
|
|
|
|
5.
TEST COVERAGE CRITERIA |
|
|
|
|
|
|
5.1.
ACTION
COVERAGE CRITERIA |
|
|
|
|
|
|
5.2.
MAPPING
COVERAGE CRITERIA |
|
|
|
|
|
|
5.3.
SCOPE
OF COVERAGE CRITERIA |
|
|
|
|
|
|
6.
TEST CASE GENERATION |
|
|
|
|
|
|
7.
TEST EXECUTION
|
|
|
|
|
|
|
8.
ACTION-EVENT TEST GENERATOR |
Duc: rewrite in March |
JG: review in April |
Paul: review in April |
Duc 1 June: rewrite based on feedback
and ASE paper |
Paul: Review in 7th July |
|
8.1.
ARCHITECTURAL
BLOCKS |
|||||
|
8.2.
AETG
IMPLEMENTATION |
|||||
|
8.3.
BETG
LIMITATIONS
|
|||||
|
9.
EVALUATION RESULTS |
|
|
|
|
|
|
9.1. CASE STUDY 1
(TESTING EFFORT) |
|
|
|
|
|
|
9.2. CASE STUDY 2
(COVERAGE CRITERIA) |
|
|
|
|
|
|
10.
CONCLUSIONS & FUTURE WORK |
|
|
|
|
|
|
11.
APPENDIX: EBNF DEFINITION OF AEFMAP |
Duc: rewrite in March |
JG: review in April |
Paul: review in April |
|
|
|
12.
REFERENCES
|
|
|
|
|
|
3.
THESIS OUTLINE
|
Sections |
Change 1 |
Change 2 |
Change 3 |
Change 4 |
Change 5 |
Change 6 |
Change 7 |
|
Thesis Outline |
JG: review in Apil |
Paul: review in April |
Duc: rewrite in May 28 based on the ideas from ASE paper |
Paul: review in June 4 |
Duc: submit new Outline in June 17 |
Paul: review in June 23 |
Duc: submit new Outline in July 10 |
